Stats
•Zero lost time incidents
•Peak man power of 250 directs & indirect labour
•$19 MM CAD in total budget executed
•10,000 bbl/day plant
Field Mechanical Construction
•2.5km flow line installation
•6 km of HDPE underground pipe line with tie ins
•8 well pair buildings and interconnecting modules
•4,455 LM pipe install
•4,000 diameter inches welded
•224 tonnes of structural steel
•31 equipment and 15 modules installed

Connacher
Fort McMurray
Stats
-
Wellpad infills, Pipeline, CPF Expansion, SAGD, MOC, Maintenance
-
Setting and installation of major equipment (tanks, packages, vessels etc.)
-
Setting and installation of buildings and pipe racks modules
-
interconnecting piping
-
Change order work on an existing plant for upgrades
-
Commissioning of lines not completed by a previous contractor
-
Maintenance
-
Installation of 3" pipeline utilizing CSA Z662 requirements