Stats
•Zero lost time incidents
•Peak man power of 250 directs & indirect labour
•$19 MM CAD in total budget executed
•10,000 bbl/day plant
Field Mechanical Construction
•2.5km flow line installation
•6 km of HDPE underground pipe line with tie ins
•8 well pair buildings and interconnecting modules
•4,455 LM pipe install
•4,000 diameter inches welded
•224 tonnes of structural steel
•31 equipment and 15 modules installed

Abandonment & Decommissioning
Radium has performed decommissioning and abandonment on multiple facilities complying with D56 notifications, stake holder notification, reporting and compliance, through OneStop submission.
Decommissioning experience:
-
Plains Midstream - NGL Optimization (Aug 2019-Mar 2020): 40 tie ins involving decommissioning, Lock Out Tag Out, demo & disposal and reinstatement.
-
Keyera KFS C3+ Frac Tie Ins (May 2015 - July 2015): 96 tie ins all requiring decomissioning and demolition work (gas detection, isolation, cold cuts, removal and disposal/recycling of abandoned lines).
-
KFS MOC projects including undergrounds (over 300 tie ins/demo) (Jan 2015-present)