Lafarge
Exshaw
Stats
-
Zero lost time incidents
-
64,500 direct man hours
-
6,000 indirect man hours
-
Over 70,000 man hours
Field Mechanical Construction
-
Structural install: 250 tonnes
-
76- Equipment install (Tanks, Packages, Heaters and Buildings)
-
12,635 LM Pipe install (Victaulic, Above and Below Ground)
-
2,500 Diameter inches of pipe fab (CS, SS and HDPE)