Stats
•Zero lost time incidents
•Peak man power of 250 directs & indirect labour
•$19 MM CAD in total budget executed
•10,000 bbl/day plant
Field Mechanical Construction
•2.5km flow line installation
•6 km of HDPE underground pipe line with tie ins
•8 well pair buildings and interconnecting modules
•4,455 LM pipe install
•4,000 diameter inches welded
•224 tonnes of structural steel
•31 equipment and 15 modules installed

Keyera
Simonette
Stats
-
Zero Lost Time Injuries
-
50+ peak daily craft labor
-
Project on time & schedule
-
Project completed on budget
Field Mechanical Construction
-
12,000 diameter inches of pipe
-
36 TNE structural tie ins
-
2,000 LM of pipe
-
20 live tie ins
-
20 module & 3 vessel/ frac tower installations
1/27