top of page
Metalworker using Welding Machine

Fabrication

Our fabrication & module assembly yard can provide over 22,000 sq./ft. of fabrication shop space; with four - 5 ton overhead cranes w/ 18' hook clearance and 6 bays. 8,000 sq./ft. of cold storage space on 13 acres for module assembly.

Certifications

We are CWB certified and are capable of a wide variety of welding processes.

  • SMAW (Stick) ​

  • FCAW ( Flux Core Arc Welding)

  • MCAW (Metal Core Arc Welding) 

  • GMAW (Gas Metal Arc Welding)

Fabrication

  • 22,000sq.ft.facilitybuilt in 2015.

  • Four–5Tonoverheadcranes w/ 18’ hook clearance & 6 total bays.

  • Current spooling capacity – 2,500 diameter inches/week.

  • Maximum spooling capacity – 5,000 diameter inches/week.

  • Capacity for 20 TNE/week of structural steel

  • Abilitytocomplete
    various types of work including structural, stainless, carbon & high tensile steel.

Capabilities

We are capable of producing 20 TNE of structural per week, and 5,000 factored diameter inches of spooling per week in various pipe material grades.

  • A333

  • A106

  • 304/316L

  • CSA 483,414,386 (CAT I,II,III)

  • SMAW (Stick)

  • GTAW (TIG)

  • RMD (Modified short circuit MIG)

Module Assembly

  • 13 acres of developed yard.

  • High grade access

  • & assembly areas.

  • Fullyfenced&gated.

  • 8,000 sq. ft. erected

  • cold storage tent.

  • Hydrotestingcapabilities.

  • 1x zoom boom, 1x

  • front end loader

  • 1x skid steer, 2x

  • TNE pickers

  • 4–16’x12’fully

  • enclosed welding shacks

  • Currentlysourcinga

  • RT crane

bottom of page