top of page

Mining & Industrial

  • Zero lost time incidents

  • Moving over 10 tons of steel a week

  • Structural install: 250 tonnes

  • Equipment installs: tanks, packages, heaters and buildings

  • LM Pipe install (Victaulic, above and below ground)

  • Pipe fabrication (CS, SS, and HDPE)

bottom of page