top of page

Heavy Oil & Thermal

  • Well-pad infills, pipeline, flowline, CPF expansion, SAGD, MOC, maintenance.

  • Setting and installation of major equipment (tanks, packages, vessels etc.)

  • Setting and installation of buildings and pipe rack modules.

  • Interconnecting piping.

  • Change order work on an existing plant for upgrades.

  • Commissioning of lines.

  • Capability of building plants of different scales.

  • Flowline installation.

  • Installation of HDPE underground pipeline with tie-ins.

  • Well pair buildings and interconnecting modules.

  • LM pipe install.

bottom of page